ARB Side Rails |
|
|
|
The side rails fit with some
holes existing, but a couple have to be drilled. The skidplate for the Diesel
pump was loosened and the rail was set in place and bolted tight with one
bolt. |
|
In the back a jack was holding
the rail tight to the frame to allow to mark the holes to be drilled. |
|
They drilled the required holes. |
|
ARB supplies 'nuts on a stick'
to be able to bolt the side rails to the frame. The nuts are stuck to the
inside of the frame to be able to catch it with a bolt. |
|
All bolts are fitted
to their counterpart and then tightened. |
|