ARB Side Rails
view gallery
 
The side rails fit with some holes existing, but a couple have to be drilled. The skidplate for the Diesel pump was loosened and the rail was set in place and bolted tight with one bolt.
In the back a jack was holding the rail tight to the frame to allow to mark the holes to be drilled.
They drilled the required holes.
ARB supplies 'nuts on a stick' to be able to bolt the side rails to the frame. The nuts are stuck to the inside of the frame to be able to catch it with a bolt.
All bolts are fitted to their counterpart and then tightened.